I’d been anxiously anticipating yesterday’s stakeholder consultation with BWS since the invite first went out because I was hoping against all the nay-sayers that this time would be the real time… that we get a sewerage system. And you guys, listen, it is for realsies this time and I’ll tell you why. Buckle up baby! All of our waste water treatment dreams are about to come true; here is the quick and clean recap of BWS’s first meeting regarding the new Resilient and Sustainable Sanitation Infrastructure Project.
Backstory
Let’s begin with the history of this project, or rather its predecessors- because this is a totally different plan than the ones we’ve seen before. For at least 15 years there’s been talk (and those infamous studies! international experts drafting endless pages of data and designs that go the same place the left socks go when you lose them in the dryer) about installing a sewerage system on the peninsula. No one can argue that it isn’t needed. We know that historically our only options have been individual septic or small scale decentralized waste treatment systems (like how many resorts and condo buildings have their own mini treatment plants). Nutrient Feed & Transport studies alongside water quality testing told us over decade ago that we were on the precipice of an ecological disaster. You KNOW how much more our community has grown since then so imagine the situation now, yikes!
Previous plans were challenging for two primary factors (from my understanding):
- Financing. Obviously this project isn’t going to be chump change. It involves acquiring land to house the treatment plant and the construction of an entire network from scratch. I believe previous projects were looking for grants which is time consuming and not a gaurentee of funds
- Logistics. Our geography presents a unique challenge because traditional gravity sewer systems won’t work on our long, flat peninsula with such a high water table. Those systems need to place their pipes like 9 feet deep and our water table is 3 feet below the soil. Plus we’d potentially need to pull waste water MILES along the peninsula to reach a treatment plant in Riversdale or send it across the lagoon which BWS doesn’t want to risk doing- imagine if a boat hit the pipe and we spilled everyone’s raw sewage directly into the bay. Yuck.
But this plan addresses those two hurdles and I think that is why it is really happening this time.
The Proposal
You can read the official report here but its over 200 pages and lots of general Belize info, not even Placencia specific stuff, and history because it is for the IDB and I guess they want to know big picture things and stats from UNICEF. But I don’t know what our Gender-based Violence Referral Pathway has to do with where our toilets flush. Anyway- the new proposal is a vacuum system that would use a mechanical wastewater treatment plant (WWTP) rather than the old-fashioned pond-style ones. It is new technology that uses a far smaller footprint, has basically zero risk of contamination breach, and puts out effluent that is so clean it could actually be repurposed!
They’re beginning construction on a similar sytem right now in Caye Caulker and they’ll be able to recycle the waste water for construction use and road wetting in dry season. How cool! Plus, with the vacuum system the network of pipes doesn’t have to be more than 3 or 4 feet deep.

The Challenges
Okay so this project is going to cost 20 million USD my dude. Basically all of that will be a loan from IDB which is pretty much locked in (final approval in December). Its not my job to worry about our national debt… besides, that sounds like a problem for our grandkids. Is it expensive? Of course. But, in my opinion, we can’t afford not to do it and we’re going to pay in one way or another eventually, so bite the bullet now. If we don’t get things right, like right away, the cost will be the destruction of the ecosystem all around us.
The other item to sort out is locations. We need a location for the WWTP and it would make the most sense for it to be centrally located on the peninsula so we’re not incurring a huge operational cost of pulling one whole long way up the peninsula. We also need locations for several smaller vacuum stations along the route (they’re about 30×30 feet and can be built to look like houses, they are supposedly not loud or running all the time so they could be quite unobtrusive). The WWTP would require a footprint of 1.5-3 acres.

Looking Ahead
So the IDB will be presented the design proposal in December and then the GOB needs to approve/accept the terms of the loan, and it typically takes another 6-8 months for assembly to get through that. So Mr. Ervin Flores expects construction to commence Q1/Q2 of 2028. Sqquuueeeee!!! In the meantime we can watch South San Pedro and Caye Caulker’s systems to see how they get along and maybe BWS refines their technique by the time they get cracking on ours.
I’m eager for the next public meeting which I anticipate will have much more pertinent information like potential locations of the treatment plant and sub stations. I’m also curious to know how we will all get linked in. How will home owners be assisted with retrofitting their properties to enter the sewer (many properties have multiple septic or gray water systems)?